MIDDLE BRANCH
The Middle Branch Passive System was installed by PADEP in 2002. The sytem has suffered from acidity overloading. In 2005, Hedin Environmental began a redesign project that would lessen acidity loading, correct several design flaws, and reconfigure several treatment units. The redesign was completed in spring 2007.
